Construction of Polesskaya TPP 5.9 MW, Ovruch, Zhytomir region.
Installation of the main steam pipeline and other technological pipelines of the TPP - turbine generator oil pipelines, feed water, drainages, blowdowns, cooling tower piping, fire extinguishing and heating.
Installation of equipment for the preparation and supply of wood chips to the boiler.
Installation of conveyors, bunkers, flue gas cleaning filters.
Installation of feed and recirculation pumps, gas ducts and air ducts.
Installation of air compressors and air ducts.