Manufacturing and installation of tanks 200 and 300 m3, Kiev

Manufactured and installed 6 tanks with a capacity of 200 and 300 m3 at the Kiev warm power station №5 PAT "Kyivenergo". Previously, the old tanks were dismantled, made new foundations, the shells of the tanks were made and transported to the thermal power plant, the shells of the tanks, the bottom and the roof were untwisted and scalded, the pipe connections were mounted, the piping was mounted, the thermal insulation of the TCM tanks was made with a ceramic coating, chemical protection of the inner surface of the tanks, thermal insulation of piping, and much more. The delivery technical documentation has been drawn up and handed over to the Customer. The work was carried out in the cramped conditions of the existing tank farm.

2013